If your door has a powder coat finish no additional finishing is required.
Bilco door installation instructions.
7 31 2019 8 13 00 am view and print product installation instructions.
If double door close secondary door first as instructed above and then close the primary door.
First assemble the size c bilco door in accor dance with the installation instructions in the door hardware package.
Prior to finish painting clean all sur faces thoroughly and apply a finish coat of acrylic latex in.
During these years it has built a reputation among architects engineers specifiers and the construction trades for dependability and for products that are unequaled in design and workmanship.
The bilco basement door will shed water in all normal conditions only when installed and caulked in accordance with these instructions.
The bilco basement door and optional exten sion panels are supplied with a uniform baked on sherwin williams primer finish.
Close door onto the frame.
The door features a factory applied powder coat paint finish and engineered lift assistance for easy one hand operation.
If there are no rain gutters above a diverter must be installed to prevent roof water from flowing directly onto the bilco basement door.
Time lapse basement door installation video time lapse video of a bilco basement door installation at the 2018 this old house idea home in narragansett rhode island.
Moisture intrusion through a bilco door is a common issue.
The bilco company has served the building industry since 1926.
Full open position is reached when the door will not travel any further in either direction if.
Door must be painted within forty five 45 days of installation.
Bilco a wholly owned subsidiary of amesburytruth which is a division of tyman plc has been a pioneer in the development of specialty.
With the non flangedportion of the extension side panels facing upward and the oval holes.
Installation instructions for a bilco classic series basement door with torsion rod lift assistance.
Turn latch handle and raise door to its full open position.
Watch this short video to see a tip on how to prevent some of this moisture intrusion.
Torsion rod lift assistance supplied on doors manufactured before april 2010 classic series doors keyed lock kit.
If your door was supplied with a red oxide primer finish it must be painted within forty five 45 days of installation.